Advantage through Contracts

Advantage through Contracts - ah life rd2jRzEum9g unsplash

A price below the regulated normal price confers an advantage. Competition is distorted even when the aid recipient does not expand its operations.

 

Introduction

An undertaking can obtain an advantage without receiving an outright grant. The advantage may be hidden in a contract for the supply of an essential input at reduced prices. This is the issue tackled by the General Court in its judgment of 13 March 2018 in case T-542/11 RENV, Aluminium of Greece v Commission concerning action for annulment of Commission decision 2012/339.[1]

In 1960, Aluminium of Greece [AoG] entered into a contract with the state-owned Public Power Corporation [PPC] for the supply of electricity at a reduced tariff. The contract was to expire in March 2006 unless the two parties agreed to renew it. In February 2004, PPC notified AoG of its intention not to renew the contract. As a result, AoG initiated legal proceedings against AoG. In 2007, a local court suspended the termination of the contract until a decision on the substance could be reached.

In January 2010, after receiving a complaint, the Commission launched the formal investigation procedure. In July 2011, the Commission adopted decision 2012/339 in which it found that Greece had granted incompatible State aid in the period after the expiry of the contract [for the period before expiry of the contract, the aid was considered to be “existing”, as the contract was signed before Greece acceded to the EU].

AoG appealed in January 2012 and the General Court ruled in October 2014 that the Commission erred in law. This judgment was reviewed here on 18 November 2014

[http://stateaidhub.eu/blogs/stateaiduncovered/post/429]

PPC, in turn, appealed to the Court of Justice and requested the annulment of the judgment of the General Court. In October 2016, the Court of Justice set aside the original judgment of the General Court [case C-590/14 P, PPC and Commission v Aluminium of Greece], on the grounds that even a national court can grant State aid by extending a measure that provides electricity at reduced prices and by so doing confers new aid. The Court of Justice returned the case back to the General Court. The judgment of the Court of Justice was reviewed here on 8 November 2016

[http://stateaidhub.eu/blogs/stateaiduncovered/post/7418]

Consequently, the General Court had to re-examine the case and correct the mistake identified by the Court of Justice.

AoG submitted ten different pleas. Only those that relate to the concept of aid and State aid procedures are analysed in this article.

 

Competence of the Commission

The General Court examined first the claim that the Commission did not have competence to determine whether the extension of the contract or, to be more precise, the suspension of the termination of the contract between AoG and PPC contained new aid. The local court adjudicated on a contract dispute under national law.

The General Court recalled that the application of the system of State aid control, as indicated by Article 108 TFEU, is a matter for the Commission and national courts. The Commission determines the compatibility of aid while national courts determine the existence of aid and whether it has been notified to the Commission. This is because Article 108(3) has direct effect and its purpose is to protect the rights of competitors. [paragraphs 51-54 of the judgment]

It follows that although the Commission does not have exclusive competence to rule on the existence of State aid, it does have exclusive competence to assess the compatibility of the aid.

The Commission must examine any new aid and any substantial modification of existing aid. The latter means that any amendments to existing aid must be notified to the Commission. Accordingly, the Commission was entitled to interpret the contract between AoG and PPC and the applicable national legal framework in order to decide whether there was new aid. On the basis of this reasoning, the General Court rejected the plea concerning lack of competence on the part of the Commission.


Do you know we also publish a journal on State aid?

EStAL banner

The European State Aid Law Quarterly is available online and in print, and our subscribers benefit from a reduced price for our events.


 

Advantage

Another plea of AoG was that the Commission failed to apply Article 107(1) TFEU correctly and, in particular, to establish the existence of an advantage.

The Court first noted that a preferential tariff for the supply of electricity could constitute State aid. Then, it observed that AoG enjoyed a tariff that was lower than the normal tariff applicable to the large industrial clients of PPC. The normal tariff was regulated at national level and was binding on PPC. AoG was the only large industrial consumer to whom the preferential tariff was applicable. As a result, the Court concluded that AoG’s costs were lower than otherwise.

Then the Court acknowledged that an advantage does not constitute State aid within the meaning of Article 107(1) TFEU if it is objectively justified by economic considerations. But it is not for the Commission to decide on the existence of such considerations. They have to be raised by the Member State that confers the advantage. The Commission carries out its assessment on the basis of information provided by the Member State. [paragraphs 124-126]

Since PPC argued convincingly that it was not compensated in any other way for the cheaper electricity it supplied to AoG, the preferential tariff could not be justified by any economic reasons.

 

Selectivity

Then AoG claimed that the Commission made an error by classifying the preferential tariff as a selective measure because the Commission did not demonstrate that that measure differentiated between undertakings which, in the light of the objective of the measure were in the same factual and legal situation.

The General Court pointed out that PPC under the principle of equal treatment, had to apply a differentiated tariff in relation to other industrial consumers on the basis of their consumption. In this connection, AoG contended that the preferential tariff was also applicable to another undertakings.

The Court first noted that a preferential tariff is not selective when it is justified by the nature of the electricity pricing system for energy-intensive users. However, this was not the case because the lower tariff was applied only in the context of the AoG-PPC agreement. [paragraphs 145-147]

 

Effect on trade and distortion of competition

AoG also contested the impact of the preferential tariff on intra-EU trade. Although it did not deny that aluminium was extensively traded, it considered that the Commission failed to demonstrate that the lower tariff enabled it to strengthen its market position since prices were determined by global competition.

The General Court first recalled that the effect on trade between Member States and distortion of competition are, as a rule, inextricably linked. [paragraph 155] Where State aid strengthens the position of an undertaking compared to other undertakings competing with it in the EU, it must be considered that that trade is affected by the aid. [paragraph 156]

In assessing those two conditions, the Court stated, the Commission is required to ask only whether the aid is capable of affecting trade between Member States and of distorting competition and not of proving that such aid has a real effect on trade between Member States and that it indeed distorts competition. It is not necessary that the Commission delineates the relevant market and analyses its structure and its competitive relationships. [paragraphs 157-158]

Since aluminium was extensively traded and the preferential tariff reduced the operating costs of AoG, the Commission correctly concluded that competition was distorted. [paragraph 162]

Then the Court made the interesting observation that AoG was confused about the difference between revenue and profit. Even if prices were fixed by international competition, AoG could still increase its profits on account of the lower operating costs from the cheaper electricity. [paragraphs 163-164]

The Court could have also pointed out that even if prices of aluminium were fixed, AoG was able to remain in the market because it could lower artificially its costs. Without the cheaper electricity tariff it could have gone out of business. The aid perhaps did not strengthen its position in the way it is normally perceived, but it could have enabled it to remain in the market.

AoG also raised several other pleas on procedural issues all of which were rejected. AoG also contested the methodology used by the Commission to calculate the amount of aid that had to be recovered.

 

Recoverable amount

AoG argued that the Commission wrongly calculated the advantage on the basis of the normal price for other large industrial consumers instead of taking into account the price that would have prevailed had PPC not enjoyed a monopoly position. Furthermore, AoG claimed that PPC abused its dominant position by charging higher prices. The Court did not accept those arguments.

First, it considered that the allegation of infringement of Article 102 TFEU to be irrelevant. [paragraph 233]. Second, it found that Commission rightly decided that the amount of the aid to be recovered was the difference between the normal tariff and the preferential tariff. [paragraph 235]

 

A final comment

AoG should have known that those arguments would not be successful. It should have pursued a different line of reasoning. It could have claimed more plausibly that it would have consumed less electricity if it had to pay a higher rate. Therefore, the advantage it derived was less than the difference in tariffs multiplied by the amount of electricity it consumed.

It must be said, however, that the case law does not, as a rule, consider counterfactuals in such situations [for an exception see the infamous Italian decoders case]. But unlike a straight grant of State aid whose counterfactual is zero aid, in this case AoG could have argued that in the absence of the contract with the PPC it would have bought less of more expensive electricity. Therefore, the amount of aid it received was the amount it would have paid minus the amount it actually paid. The counterfactual to the aid in this case is determined both by the normal price and the likely quantity at the normal price. For example, assume that the normal rate is 10, the reduced rate is 6 and that AoG consumed 100 units of electricity. It appears that the amount of aid is 400 [= (10 x 100) – (6 x 100)]. But if at the higher rate, it would have consumed only 70 units of electricity and therefore it would have spent 700, the amount of the advantage would be only 100 [= (10 x 70) – (6 x 100)]. Admittedly, this is a line of reasoning that has not been endorsed by EU courts. But I am not sure whether it has been tested before EU courts. I would appreciate receiving your views on this issue.

———————————————

[1] The full text of the judgment can be accessed at:

http://curia.europa.eu/juris/fiche.jsf?id=T%3B542%3B11%3BRAL%3B1%3BP%3B1%3BT2011%2F0542%2FJ%2F1&pro=&lgrec=en&nat=or&oqp=&dates=%2524type%253Dpro%2524mode%253D8D%2524from%253D2018.03.08%2524to%253D2018.03.16&lg=&language=en&jur=C%2CT&cit=none%252CC%252CCJ%252CR%252C2008E%252C%252C%252C%252C%252C%252C%252C%252C%252C%252Ctrue%252Cfalse%252Cfalse&td=%3BALL&pcs=Oor&avg=&mat=PEM%252CCONC.AIDE%252Cor&etat=clot&jge=&for=&cid=843360

Tags

About

Phedon Nicolaides

Dr. Nicolaides was educated in the United States, the Netherlands and the United Kingdom. He has a PhD in Economics and a PhD in Law. He is professor at the University of Maastricht and the University of Nicosia. He has published extensively on European integration, competition policy and State aid. He is also on the editorial boards of several journals. Dr. Nicolaides has organised seminars and workshops in many different Member States, and has acted as consultant to several public authorities.

Comments

  1. by Rita Aleixo Gregório

    I tend to agree with the suggested line of reasoning in respect to the calculation of the recoverable amount. It seems a more plausible and frankly more realistic and fair method of calculation, considering that the purpose of recovery is to re-establish the situation that existed on the market prior to the granting of the aid. It seems to me that such line of reasoning would, nonetheless, introduce speculative elements around these matters as, most of the times, it would be difficult to demonstrate straightforwardly the exact amount of electricity that a company would have bought in the absence of a contract for the supply of electricity at a reduced tariff. I am not sure either whether this line of reasoning has been tested before the EU Courts, but I would be surprised if the Commission or/and the EU Courts would be willing to accept it, particularly considering the implications that it may have for the immediate and effective execution of a recovery order.

  2. by Dr. Hans Arno Petzold

    This is an interesting point, indeed. But I have doubts whether this argument will carry through. Any counterfactual scenario must be realistic and credible in itself. In this case, AoG would have had to argue that higher costs for electricity would have deteriorated their competitive position on the market, thus led to reduced sales, reduced production, and reduced consumption of energy. This would necessarily imply that they were not able to compensate for higher prices for electricity at some other point in their calculation or cost structure, and that this claimed reduction was inevitable and coherent in itself. I find this a rather daring approach, considering the complexity of markets and cost calculations, which I would not necessarily advise to my client, if only for the sake of the argument. N. B. In this case we are not talking about the presence of aid, but only discussing its amount, aren’t we?

  3. by Melvyn Waumsley

    There is of course a good argument for not calculating the aid from the counterfactual perspective. Given that there was an actual amount of electricity consumed with the help of the concessionary price, the resulting aluminium produced was driven by this reduced price, therefore the effects on trade relate directly to value of the unit price concession multiplied by the real number of units of electricity consumed in the period.

  4. by Phedon Nicolaides

    All good points. As I wrote, I do not think there is a precedent for the use of counterfactual in the case law. For sure it will not be easy. Since the argument put forth by AoG was hopeless, I suppose defendants will have to come up with more innovative approaches. I was testing a possible option.

Leave a Reply

Related Posts

17. Sep 2024
State Aid Uncovered by Phedon Nicolaides
Although Member States Are Free to Determine their Tax Systems, they Must still Conform with State Aid Rules - State Aid Uncovered photos 11

Although Member States Are Free to Determine their Tax Systems, they Must still Conform with State Aid Rules

Introduction On 10 September 2024, the Court of Justice [CJEU] delivered its much anticipated judgment, in case C-465/20 P, Commission v Ireland & Apple. It ruled that Ireland had granted incompatible State aid to Apple through preferential tax rulings.[1] The judgment was the result of an appeal by the Commission against the judgment of the General Court in case T-778/16, Ireland […]
30. Aug 2024
State Aid Uncovered by Phedon Nicolaides
A State-Owned Company Acts as a Private Investor – Part II - State Aid Uncovered photos 9

A State-Owned Company Acts as a Private Investor – Part II

Part II: Advantage The Commission, first, explained that the “(80) intervention must be considered as a whole, considering the purpose and timing of the various stages in which AMCO’s intervention is to be made, within the context and contents of the second arrangement proposal. Whether or not a transaction is in line with market conditions must be established through a […]
27. Aug 2024
State Aid Uncovered by Phedon Nicolaides
A State-Owned Company Acts as a Private Investor - State Aid Uncovered photos 8

A State-Owned Company Acts as a Private Investor

Introduction When a party to a financial transaction is a company that is owned and controlled by the state, it is difficult to determine whether the transaction is free of State aid. This is because it is not easy to prove that the state had no influence over the decision of the company to carry out that transaction. The Commission […]
06. Aug 2024
State Aid Uncovered by Phedon Nicolaides
The Existence of State Aid Must Be Proven on the Basis of Credible Evidence - State Aid Uncovered photos 5

The Existence of State Aid Must Be Proven on the Basis of Credible Evidence

Introduction This article reviews two cases in which courts found that it had not been proven that all of the criteria of Article 107(1) TFEU had been satisfied. Case I: Not being able to prove that the measure is attributed to a decision of the state With decision 2024/2033, published in OJ L, 29 July 2024, the Commission corrected its […]
02. Jul 2024
State Aid Uncovered by Phedon Nicolaides
Green Energy Certificates - State Aid Uncovered photos 3

Green Energy Certificates

Introduction Certificates that confirm that an undertaking has bought a certain amount of electricity from renewable sources do not normally involve State aid because they are not traded. However, when they are tradeable and are granted by a public authority for free or for a fee that falls below their market value, they normally involve State aid as they confer […]
18. Jun 2024
State Aid Uncovered by Phedon Nicolaides
Obligations Imposed by the State Cannot Justify Tax Exemptions - State Aid Uncovered photos 18

Obligations Imposed by the State Cannot Justify Tax Exemptions

Introduction Over the past decade or so, the European Commission has found that multiple port operators have benefitted from State aid in the form of tax exemptions. This aid was in all cases found to be incompatible with the internal market, despite the claims of the port operators that the state had imposed on the public service obligations or that […]
04. Jun 2024
State Aid Uncovered by Phedon Nicolaides
Special Tax Treatment for a Major Infrastructure Project - State Aid Uncovered photos 16

Special Tax Treatment for a Major Infrastructure Project

Introduction In April 2013, the Commission received a complaint alleging that State aid had been granted to the Oresund fixed link. The link is a major transport infrastructure project consisting of a bridge, an artificial island and tunnels between Denmark and Sweden. In October 2014, the Commission concluded that the public funding of the hinterland road and rail connections was […]
07. May 2024
State Aid Uncovered by Phedon Nicolaides
Public Procurement and State Aid - State Aid Uncovered photos 2

Public Procurement and State Aid

Introduction A faulty public procurement procedure or the use of discriminatory selection criteria can confer an advantage on the chosen undertaking that may constitute an advantage in the meaning of Article 107(1) TFEU. The result will be infringement of both public procurement rules and State aid rules. A recent Commission decision, SA.47650, is instructive on how Member States should design […]
23. Apr 2024
State Aid Uncovered by Phedon Nicolaides
Pricing of Access to Infrastructure for the Treatment of Waste Water - State Aid Uncovered photos 10

Pricing of Access to Infrastructure for the Treatment of Waste Water

Introduction It is not unusual for EU courts to refer to the Commission’s 2016 Notice on the Notion of State Aid as a means of shedding light to the more obscure aspects of that notion. What is very unusual is for EU courts to treat the Notice as if it has the same status as the guidelines that bind the […]
09. Apr 2024
State Aid Uncovered by Phedon Nicolaides
An Innovative Risk-Sharing Tool for the Support of an LNG Terminal - State Aid Uncovered photos 8

An Innovative Risk-Sharing Tool for the Support of an LNG Terminal

Introduction The Commission, in decision SA.102163, authorised State aid for the construction of a terminal for liquefied natural gas [LNG] in Brunsbüttel, Germany.1 The project consists of an LNG import, storage and distribution facility with annual capacity of about 10 billion m3. The project is carried out by the German LNG Terminal GmbH [GLNG] which has three shareholders: the Dutch […]