Compliance with State Aid Rules in Cohesion Policy: A Special Report of the European Court of Auditors

Compliance with State Aid Rules in Cohesion Policy: A Special Report of the European Court of Auditors - m 14 1
Control of State aid by national authorities needs to be strengthened. Typical mistake is to grant aid after a project has started or to subsidise ineligible costs. Aid measures for risk capital, SGEI and R&D appear to be particularly prone to error. 

 

Introduction

 

On 4 October 2016, the European Court of Auditors [ECA] published a special report 24/2016 on enforcement and compliance with State aid rules in cohesion policy.[1] It is the second time that the ECA has issued a special report on State aid. In 2011, the ECA, in the special report 15/2011, criticised the Commission for not monitoring rigorously enough how Member States implement State aid measures after they are approved by the Commission. The findings of that report must have influenced significantly the aims of the State Aid Modernisation which was launched in 2012 and which sought, among other things, to make State aid more transparent.DG Competition also published in September a Competition Policy Brief with the title “State aid transparency: Why? What? When? Where? How?”.[2] It explains the reasons for setting up the new data base where Member States must report all individual awards of aid exceeding EUR 500,000.The Annual Report of the ECA on the implementation of the EU budget always identifies “irregularities” in projects funded by structural funds. Most of the irregularities concern eligibility of declared costs. In addition, the ECA routinely discovers irregularities in the form of non-compliance with State aid rules. For example, the latest Annual Budget Report (for 2015) that was issued on 13 October 2016, found that about 6% of all irregularities in structural fund operations were attributed to State aid problems.[3] However, this result was far better than that which was recorded in the previous Annual Budget Report for 2014 (issued in November 2015). In the 2014 Report, the ECA found that over 21% of errors were attributed to misapplication of State aid rules.

Over the past decade or so, the three most frequent State aid problems have been largely the same every year. First, aid is granted to ineligible costs. Second, Member States fail to ensure that aid has an incentive effect. They grant aid after the project has started. This is the most elementary and worst mistake anyone can make in the field of State aid. Third, aid exceeds the maximum allowable rate of aid intensity. In fact, all three of these mistakes are fairly predictable and therefore avoidable.

The ECA special report also refers to the ex ante conditionalities for State aid which are laid down in Regulation 1303/2013 which is the common provisions regulation for structural funds. In effect, the conditionalities require Member States to show that they have put in place sufficient administrative capacity to ensure effective application of State aid rules. The Commission is right to expect Member States to have the proper administrative procedures for dealing with State aid. But effective implementation can be a nebulous concept. Since the purpose of the ex ante conditionalities is to improve compliance rather than the effectiveness of the aid itself [i.e. the impact of aid on productivity, competitiveness, innovation, etc], then there will certainly be a marked improvement if Member States can avoid the elementary mistakes. Mistakes are elementary if they are predictable and if they are predictable they are avoidable.

Professionals as diverse as doctors, pilots and conference organisers rely on checklists to avoid predictable mistakes.[4] Here is my checklist for reducing and even eliminating what I mentioned above as the elementary mistakes in the implementation of State aid measures. It is expressed in the form of four instructions to aid granting authorities:

  1. Presume that public funding is State aid when granted to any entity that offers a good or service for remuneration. Check whether one or more criteria of Article 107(1) TFEU do not apply.
  2. State aid may be granted only before the project starts. Check that the project has not started.
  3. All State aid is subject to a ceiling. Check which is the applicable ceiling for the aid you are about to grant.
  4. State aid can fund only certain costs. Check which are the eligible costs for the aid you are about to grant.

 

This simple checklist should be able to prevent most of errors found by the ECA and the Commission.

ECA, Special Report 24/2016: “More efforts needed to raise awareness of and enforce compliance with State aid rules in cohesion policy”

The report is made up of the following chapters:

  1. The concept of State aid and the amount of aid granted in the EU.
  2. Procedures for granting State aid and the obligation of Member States to notify State aid to the Commission.
  3. Exemptions to notification.
  4. The actors involved in managing operational programmes in cohesion policy.
  5. Audit findings.
  6. Annex I: Spending on State aid by Member State in 2010-2014.
  7. Annex II: Results of the monitoring exercises carried out by DG Competition, 2006-2014.
  8. Annex III: Major projects adopted by DG Regional Policy in the 2007-2013 programme period.
  9. Annex IV: Legal framework in the area of State aid.

Main findings of the special report

The ECA special report starts with an explanation of the concept of State aid, an overview of the amounts of aid granted by Member States. The report groups its findings under the following eight headings:

  1. Lack of comprehensive analysis by the Commission of State aid errors and insufficient Member State focus on State aid.
  2. Significant number of State aid errors in the European Regional Development Fund [ERDF], the Cohesion Fund and the European Social Fund ESF].
  3. The monitoring of the Commission is weakened by a lack of a comprehensive analysis and insufficient internal coordination.
  4. Insufficient focus of Member States’ audit authorities on compliance with State aid rules.
  5. The Commission has taken action to simplify applicable State aid legislation and to promote administrative capacity of Member States.
  6. The expanded General Block Exemption Regulation [GBER] leads to a shift of responsibility from the Commission to Member States.
  7. Newly introduced ex ante conditionalities and the major project procedure may improve compliance with State aid rules in cohesion policy.
  8. A State aid common action plan set up by the Commission aims to strengthen the administrative capacity of Member States and requires continuous attention.

Frequency and type of detected errors

The ECA sought to find out whether the Commission systematically recorded detected errors in the implementation of State aid measures. Audits carried out by DG Regional Policy detected State aid problems in about 19% of the projects it audited and ordered financial corrections.

The ECA also reviews the results of the ex post monitoring carried out by DG Competition. As far as I know, this is the first time that this information has been put in the public domain. DG COMP found that about 36% of the measures that it checked had problems, but only 7% of the measures had problems that would affect the compatibility of the aid. GBER-based measures showed problems in about 12% of all cases. In five Member States more than 50% of all measures examined by DG COMP were problematic.

For a large proportion of the measures where problems were detected, no recovery of aid was ordered because of the retroactive application of the GBER. Aid that was incompatible when it was granted could retroactively fall within the scope of the GBER which is wider and with higher aid intensity ceilings.

The ECA criticises the Commission services for not having a systematic typology of State aid errors and for not sharing information of what the various DGs found in their routine audits.


Do you know we also publish a journal on State aid?

EStAL banner
The European State Aid Law Quarterly is available online and in print, and our subscribers benefit from a reduced price for our events.


 

It should be noted that the ECA itself has detected a significant number of errors through its own audit activities. In the period 2010-14, the ECA audited 1,573 randomly selected ERDF/CF and ESF projects. Of the 828 ERDF/CF audited projects, 220 (26.6%) were State aid relevant. Of the 745 ESF audited projects, 49 (6.6%) were State aid relevant. The ECA found a total of 50 cases of non-compliance with State aid rules. Of these 50 cases, 46 related to ERDF/CF projects (21%) and 4 to ESF projects (8%). The ECA observes+ that “35. From 2010 to 2014, both the number of projects with State aid relevance and the share of these projects being affected by State aid errors generally increased, indicating that the controls in place to prevent these errors had not improved over time.”

In terms of type of error, the most frequent problems found were:

  1. Aid intensity too high. A problem that was encountered several times was incorrect granting of the SME bonus to large companies.
  2. Absence of incentive effect. A typical problem here was the granting of aid to projects that had already started when the application for aid was made.
  3. Undetected State aid or lack of notification. In some cases granting authorities took into account the status of the beneficiary without considering that what matters in the economic nature of the activity that is actually carried out.
  4. Monitoring or formal requirements not met. Some public authorities granted de minimis aid without ensuring that the total amount, including any received from other sources, remained below the de minimis threshold of EUR 200,000.

Controls by national authorities

The ECA also criticises national authorities for not finding enough errors. In the period 2010-14, national audits found State aid related errors in only 4% of the cases examined. The most common error had to do with de minimis aid. The ECA notes that using the same methodology it discovered 5 times more errors in the same period. The ECA also checked the audit lists of national authorities and in about 33% of them it found shortcomings such as not requiring that the intensity of aid was verified.

A survey of national audit authorities found that 73% of them considered State aid rules to be fairly complex and 24% considered them to be very complex. That is, 97% of the national audit authorities did not perceive State aid rules as being simple. About 85% of the respondents indicated that they needed more support and guidance from the Commission. Interestingly, the ECA finds that the Member States with the most errors are not those which did not fulfil the ex conditionalities for State aid as defined in the Structural Funds Regulation 1303/2013.

The ECA report also comments on the wider scope of application of the new GBER and observes that Member States now bear more responsibility for the correct application of more types of State aid. However, it also notes that the administrative burden is at the same time reduced by the fact that Member States do not have to confirm the existence of an incentive effect when aid is granted to large enterprises within a scheme.

The ECA report observes that Member States are incentivised to use the GBER, not only because it is wide in scope and with higher thresholds but also because the guidelines have become stricter.

As is the purpose of the report, it concludes with recommendations. As always is the norm with these reports, the Commission replies to the observations and recommendations of the ECA.

The findings of the Commission’s own ex post monitoring, 2006-2014

Annex II of the report presents the results of the Commission’s own ex post monitoring of State aid measures in the period 2006-2014. As mentioned above, it is the first time that this information is put in the public domain. Also worth mentioning is the fact that the information spans almost a decade.

Table 1 below reproduces the first part of Annex II. Obviously, services of general economic interest appear to be the most problematic, but the small sample may be biased. What in fact, should be concluded from these numbers is that Member States get it wrong in about 30% of all cases regardless of whether the measures are block-exempted or not. It is thought that GBER-based aid is less complicated because the GBER provisions are less demanding. But perhaps precisely because it appears easy to use and many more authorities make use of it, more mistakes are made.

Table 2 reproduces the second part of Annex II and it shows the proportion of errors per type of State aid. Aid for research and for risk capital appear particularly prone to error. So if we ignore the small number of cases for risk capital and SGEI, we may conclude that the three areas where Member States need to pay particular attention are risk capital, SGEI and R&D.

Table 1

Compliance with State Aid Rules in Cohesion Policy: A Special Report of the European Court of Auditors - Blog41 Table%201

Table 2

Number of schemes monitored Number of problematic cases Ratio of problematic cases
Broadband 7 2 29 %
Culture 11 3 27 %
Employment 15 5 33 %
Environment and energy 45 14 31 %
Other horizontal 2 0 0 %
Regional development 64 18 28 %
Research and Development 47 19 40 %
Risk capital 10 6 60 %
Sectoral development 5 1 20 %
SMEs 31 5 16 %
Training 25 4 16 %
Transport 16 6 38 %
Rescue & Restructure 9 1 11 %
Services of general economic interest 8 4 50 %
Other 1 1 100 %

 

————————————————————

[1] The special report can be accessed at

http://www.eca.europa.eu/Lists/ECADocuments/SR16_24/SR_STATE_AIDS_EN.pdf.

[2] The Policy Brief can be accessed at http://ec.europa.eu/competition/publications/cpb/2016/2016_004_en.pdf.

[3] The ECA Annual Report can be accessed at:

http://www.eca.europa.eu/Lists/ECADocuments/annualreports-2015/annualreports-2015-EN.pdf.

[4] Atul Gawande, The Checklist Manifesto: How to Get Things Right, (New York: Picador, 2011).

Tags

About

Phedon Nicolaides

Dr. Nicolaides was educated in the United States, the Netherlands and the United Kingdom. He has a PhD in Economics and a PhD in Law. He is professor at the University of Maastricht and the University of Nicosia. He has published extensively on European integration, competition policy and State aid. He is also on the editorial boards of several journals. Dr. Nicolaides has organised seminars and workshops in many different Member States, and has acted as consultant to several public authorities.

Leave a Reply

Related Posts

05. Nov 2024
State Aid Uncovered by Phedon Nicolaides
State Aid to Support “Applied Research” in Solid-State Batteries - State Aid Uncovered photos 11

State Aid to Support “Applied Research” in Solid-State Batteries

Introduction France notified a measure to grant State aid to ProLogium for the implementation of the Promotheus R&D project which concerned the development of solid-state batteries [SSB] for electric vehicles. ProLogium is a large enterprise with 758 employees. The Commission approved the measure in decision SA.106740.[1] The aid measure has several unusual features. First, ProLogium committed to disseminate the scientific […]
29. Oct 2024
State Aid Uncovered by Phedon Nicolaides
An Unusual SGEI - State Aid Uncovered photos 16

An Unusual SGEI

Introduction Member States are free to determine what the regard as a service of general economic interest [SGEI]. The Commission may only check whether the definition is free of manifest error and that any compensation that is provided conforms with the conditions laid down in the 2012 SGEI package. Member States commit a manifest error when they designate as SGEI […]
16. Oct 2024
State Aid Uncovered by Phedon Nicolaides
European Court of Auditors, Report on the Implementation of the EU Budget for the 2023 Financial Year, 10 October 2024 - State Aid Uncovered photos 10

European Court of Auditors, Report on the Implementation of the EU Budget for the 2023 Financial Year, 10 October 2024

The annual report on the 2023 EU budget by the European Court of Auditors finds that in the field of State aid national authorities wrongly supported ineligible costs. Errors in public procurement and State aid were the largest source of irregularities. Main findings concerning public procurement and State aid “The risk of error is high for expenditure subject to complex […]
28. May 2024
State Aid Uncovered by Phedon Nicolaides
A Research Project Based on Collaboration with a Research Organisation - State Aid Uncovered photos 15

A Research Project Based on Collaboration with a Research Organisation

Introduction After pre-notification contacts, Croatia notified, in March 2023, State aid amounting to a EUR 179.5 million for an R&D project regarding the development of an innovative autonomous electric vehicle [a “robo-taxi”]. The aid, in the form of a grant, was to be provided to Project 3 Mobility LLC [P3M]. The Commission approved it in decision SA.101759.1 The aid beneficiary, […]
12. Oct 2021
State Aid Uncovered by Phedon Nicolaides
Security of Supply May Justify a Deviation from Public Procurement Rules - Blog visual 41

Security of Supply May Justify a Deviation from Public Procurement Rules

Security of supply justifies a deviation from the normal procurement procedures as long as the same security cannot be achieved through a competitive selection of suppliers. Introduction Point 19 of the 2012 SGEI Framework requires that the assignment of a public mission to an undertaking must comply with the applicable public procurement rules. It does not impose an obligation for […]
07. Sep 2021
State Aid Uncovered by Phedon Nicolaides
Assignment of Public Service Obligations - wordyannik mika GjFbKfI874o unsplash

Assignment of Public Service Obligations

The compensation for public service obligations may include reasonable profit and incentives for cost reduction. Introduction Member States have discretion to define services they consider to be in the general economic interest [SGEI]. However, they need to justify that definition. The Court of Justice has ruled on numerous occasions that an SGEI has “special characteristics” that set it apart from […]
25. May 2021
State Aid Uncovered by Phedon Nicolaides

Compensation for Universal Service Provision

As long as the compensation does not exceed the net extra costs of the universal service activities, it may be used to offset other costs. Introduction The rules on State aid for services of general economic interest [SGEI] are very generous because they allow both investment and operating aid. Yet, it is not easy to comply with those rules because […]
20. Apr 2021
State Aid Uncovered by Phedon Nicolaides
Draft New RDI Framework - StateAidHub blogpost16 RDI

Draft New RDI Framework

The new RDI Framework provides continuity with clarity. On Monday, 19 April 2021, the European Commission published the new Regional Aid Guidelines for the period 2022-2027. They can be accessed at: https://ec.europa.eu/competition/state_aid/regional_aid/RAG_2021_adopted_communication.zip Introduction On 8 April 2021, the European Commission published the text of the draft new RDI Framework and launched public consultation.[1] The draft RDI Framework is accompanied by […]
15. Sep 2020
State Aid Uncovered by Phedon Nicolaides
Non-economic Activities and Services of General Economic Interest - environmental protection 683437 1280

Non-economic Activities and Services of General Economic Interest

Non-economic tasks and economic activities which are inseparable from those non-economic tasks are together, as a bundle, non-economic in nature. Public compensation for the extra costs of services of general economic interest [SGEI] may not cross-subsidise activities that fall outside the scope of the SGEI. Update on Temporary Framework: Number of approved and published covid-19 measures, as of 11 September […]
12. Feb 2020
State Aid Uncovered by Phedon Nicolaides
An Important (and so far, Unique) Project of Common European Interest - StateAidHub blogpost6 microplastics IPCEI

An Important (and so far, Unique) Project of Common European Interest

State aid for important R&D projects of common European interest can cover different costs than the RDI Framework and at different rates of intensity. Introduction Several Member States have demanded a more active industrial policy to counteract perceived unfair foreign competition. The Commission’s response has partly been that current rules do allow cross-border cooperation for the development of innovative products. […]