Existing Aid, New Aid and Retroactive Application of a Block Exemption Regulation

Existing Aid, New Aid and Retroactive Application of a Block Exemption Regulation - 28 reuben teo XvxFqD3uUEk unsplash 16.9 scaled

Changes to approved aid measures result in new aid. Only purely formal or administrative changes do not turn existing aid into new.

Prolongation of an existing aid measure is not purely formal or administrative.

Introduction

Any change to an approved aid measure that affects its compatibility with the internal market turns it into a new aid that has to be re-notified to the European Commission for authorization. If it is not re-notified it becomes illegal aid and possibly incompatible aid, unless it can benefit from a retroactive application of a block exemption regulation or of the de minimis regulation.

On 20 May 2021, the Court of Justice, in its judgment in case C ‑ 128/19, Azienda Sanitaria Provinciale di Catania v Assessorato della Salute della Regione Siciliana, had to examine whether the aid granted through a modified measure became new or it whether it remained existing. [1]

Azienda Sanitaria Provinciale di Catania (Regional Health Authority of Catania) [ASPC] initiated proceedings in a local court against Assessorato della Salute della Regione Siciliana (Health Directorate of the Region of Sicily).

The case concerned compensation demanded from ASPC by “AU”, a farmer who had been obliged to slaughter diseased animals. AU claimed the sum of EUR 11 930. The compensation was provided by an Italian law regulating the compulsory animal slaughter to prevent the spread of animal diseases.

ASPC argued that the compensation constituted State aid which could not be implemented before the Commission had declared it compatible with the internal market.

The referring Italian court asked the Court of Justice to clarify whether the compensation was State aid. Compensation was in fact made available under several measures adopted in 1997, 1999 and 2005. The first two measures had been authorized by the Commission.

Existing or new aid?

First the Court reiterated the exclusive competence of the Commission to assess the compatibility of State aid.

“(28) Until a final decision has been taken by the Commission, it is for the national court to ensure that the rights of individuals are safeguarded in the case where State authorities may potentially be infringing the obligations referred to in Article 108 (3) TFEU. Such disregard, if relied on by individuals and confirmed by the national courts, must lead those courts to draw all the consequences in accordance with their national law, without their decisions, however, implying an assessment of the compatibility of the aid with the internal market , which is a matter within the exclusive competence of the Commission, subject to review by the Court. “

Then the Court examined whether the relevant law was existing or new aid.

“(30) It must be recalled at the outset that Article 108 TFEU establishes separate procedures for existing and new State aid. Whereas Article 108 (1) TFEU allows for existing aid to be implemented as long as the Commission has not found it to be incompatible with the internal market, Article 108 (3) TFEU provides that plans to grant or alter existing aid must be notified, in sufficient time, to the Commission and may not be implemented until the examination procedure has resulted in a final decision ”.

“(32) Under Article 1 (b) (ii) of Regulation No 659/1999, the concept of ‘existing aid’ encompasses’ authorized aid, that is to say, aid schemes and individual aid which have been authorized by the Commission or by the Council ‘, whereas, under Article 1 (c) of that regulation,’ new aid ‘means’ all aid, that is to say, aid schemes and individual aid, which is not existing aid, including alterations to existing aid’. ”

“(33) Furthermore, the first sentence of Article 4 (1) of Regulation No 794/2004 provides that, ‘for the purposes of Article 1 (c) of Regulation [No 659/1999], an alteration to existing aid shall mean any change, other than modifications of a purely formal or administrative nature which cannot affect the evaluation of the compatibility of the aid measure with the [internal] market ‘. “

In the present case, the Court found that the “(34) measures therefore constitute, […], an authorized aid scheme, and, therefore, ‘existing aid’ within the meaning of Article 1 (b) (ii) of Regulation No 659/1999. “

“(35) As regards the 2005 measure, while it has the same objective as the 1997 and 1999 measures, namely the refinancing of compensation […], it provides for both, […], an increase of EUR 20 million in the budget allocated to the aid scheme authorized by the Commission in its 2002 decision and a prolongation of the compensation refinancing period from 2000 to 2006. “

“(36) Such changes to the authorized aid scheme cannot, however, be regarded as being purely formal or administrative in nature within the meaning of the first sentence of Article 4 (1) of Regulation No 794/2004. On the contrary, they constitute an alteration to existing aid within the meaning of Article 1 (c) of Regulation No 659/1999. “

“(37) It follows from the Court’s case-law that prolonging the period for application of a previously authorized aid scheme, whether or not combined with an increase in the budget allocated to that scheme, gives rise to new aid, distinct from the authorized aid scheme ”.

“(38) Likewise, Article 4 (2) (b) of Regulation No 794/2004 lists the ‘prolongation of an existing authorized aid scheme by up to six years, with or without an increase in the budget’, among the alterations made to existing aid which must, in principle, be notified to the Commission by means of the simplified notification form. “

“(39) In those circumstances, a measure providing for both the prolongation of an authorized aid scheme from 2000 to 2006 and the increase of EUR 20 million in the budget allocated to that scheme must be deemed to constitute ‘new aid’ within the meaning of Article 1 (c) of Regulation No 659/1999. “

Aid within the agricultural block exemption regulation?

The Italian Government argued that the 2005 measure was exempted from the notification requirement on the basis of Regulation 702/2014, the agricultural block exemption regulation [ABER].

“(42) Regulation No 702/2014, […], provides, in Article 3, that, notwithstanding the general obligation to notify each measure intended to grant or alter ‘new aid’ within the meaning of Article 108(3) TFEU, which constitutes one of the fundamental features of the system of monitoring in the field of State aid, a Member State may, under that regulation, rely on the exemption from that requirement if an aid measure which it adopted or an aid project which it plans to adopt fulfils the conditions laid down therein. As a qualification of that general obligation, those conditions must be interpreted strictly. Conversely, the notification and standstill requirements laid down in Article 108(3) TFEU remain applicable to State aid not covered by Regulation No 702/2014”.

“(43) As regards, in the first place, the applicability ratione temporis of Regulation No 702/2014 to the dispute in the main proceedings, Article 51 of that regulation, which concerns transitional provisions, provides, in paragraph 1, that that regulation applies to individual aid granted before the date of its entry into force, if that aid fulfils all the conditions laid down in that regulation, with the exception of Articles 9 and 10.”

“(44) According to point 12(b) of Article 2 of Regulation No 702/2014, the concept of ‘individual aid’, within the meaning of that regulation, includes all awards of aid to individual beneficiaries on the basis of an aid scheme. In addition, the ‘date of granting the aid’ is defined in point 29 of Article 2 of that regulation as being the date when the legal right to receive the aid is conferred on the beneficiary under the applicable national legal regime.

“(45) Although Regulation No 702/2014 does not define the term ‘granted’, referred to in Article 51(1) of that regulation, it follows from the Court’s case-law that, from the moment at which the right to receive support through State resources is conferred on the beneficiary under the applicable national legislation, the aid must be deemed to be granted, with the result that the actual transfer of the resources in question is not decisive”.

“(46) It follows that ‘individual aid’ within the meaning of point 12 of Article 2 of Regulation No 702/2014, which was granted before 1 July 2014 on the basis of an aid scheme such as the 2005 measure, comes within the temporal scope of that regulation.”

“(47) In the second place, as regards the conditions which must be fulfilled under Regulation No 702/2014 in order for an exemption to be possible from the general notification requirement, it follows from Article 3 of that regulation that, in order for individual aid granted under aid schemes to be exempted from that requirement, that aid must fulfil all the conditions laid down in Chapter I of that regulation, as well as the specific conditions for the relevant category of aid laid down in Chapter III of that regulation.”

“(48) As regards the conditions set out in Chapter I of Regulation No 702/2014, Article 4 thereof establishes gross grant equivalents beyond which that regulation does not apply to individual aid, while Articles 5 and 6 of that regulation make its application contingent on the respective conditions that the aid be transparent and have incentive effect. Articles 7 and 8 of Regulation No 702/2014 respectively concern aid intensity and eligible costs and the rules on cumulation. As for Articles 9 and 10 of that regulation, which concern, respectively, publication and information and the avoidance of double publication, it follows from Article 51(1) of that regulation that individual aid granted before its entry into force is not included in the aid which must fulfil the conditions laid down in those Articles 9 and 10.”

“(49) Concerning the specific conditions laid down in Chapter III of Regulation No 702/2014, Article 26 of that regulation concerns aid to cover the costs of prevention, control and eradication of animal diseases and intended to make good the damage caused by such diseases.”

“(50) According to Article 26(1) of Regulation No 702/2014, aid granted to small and medium-sized enterprises active in primary agricultural production to support the costs of preventing, controlling and eradicating, in particular, animal diseases and aid to compensate such undertakings for losses caused, in particular, by those animal diseases, is exempted from the notification requirement provided for in Article 108(3) TFEU in the case where that aid meets the conditions laid down in paragraphs (2) to (13) of Article 26 and in Chapter I of Regulation No 702/2014. Among those conditions, the second subparagraph of Article 26(6) provides that such aid must be paid out within four years from the date of the occurrence of the cost or loss caused by the animal disease.”

De minimis aid?

The Court also consider whether the aid could be classified as de minimis.

“(51) As regards the question, raised by the Commission in its response to the Court’s questions, as to whether the compensation claimed by AU under the 2005 measure constitutes de minimis aid within the meaning of Regulation No 1408/2013, which entered into force on 1 January 2014, it must be noted that Regulation No 1408/2013 applies, pursuant to Article 7(1) thereof, the wording of which is the same as that of Article 51(1) of Regulation No 702/2014, to aid granted before its entry into force if that aid fulfils all the conditions laid down in that regulation.”

“(52) Furthermore, according to Article 3(1) of that regulation, aid measures are deemed not to meet all the criteria set out in Article 107(1) TFEU, and are therefore exempt from the general notification requirement in Article 108(3) TFEU, if they fulfil all of the conditions set out in that regulation, including that laid down in Article 3(2) therein according to which, […], the total amount of the de minimis aid granted per Member State to a single undertaking must not exceed EUR 15 000 over any period of three fiscal years.

“(53) It follows from all of the foregoing considerations that Article 108(3) TFEU must be interpreted as meaning that a measure introduced by a Member State to finance, for a period extending over several years and up to a maximum amount of EUR 20 million, both compensation to support farmers who have been obliged to slaughter animals affected by infectious diseases and payment of fees due to self-employed veterinary surgeons involved in remediation activities, must be subject to the preliminary-examination procedure laid down in that provision in the case where that measure is not covered by an authorisation decision of the Commission to that effect, unless that measure fulfils the conditions laid down by Regulation No 702/2014 or the conditions laid down by Regulation No 1408/2013.”


[1] The full text of the judgment can be accessed at:

https://curia.europa.eu/juris/document/document.jsf?text=&docid=241466&pageIndex=0&doclang=EN&mode=lst&dir=&occ=first&part=1&cid=6807125


Photo by Reuben Teo on Unsplash

Tags

Über

Phedon Nicolaides

Dr. Nicolaides was educated in the United States, the Netherlands and the United Kingdom. He has a PhD in Economics and a PhD in Law. He is professor at the University of Maastricht and the University of Nicosia. He has published extensively on European integration, competition policy and State aid. He is also on the editorial boards of several journals. Dr. Nicolaides has organised seminars and workshops in many different Member States, and has acted as consultant to several public authorities.

Zusammenhängende Posts

04. Jun 2024
State Aid Uncovered von Phedon Nicolaides
Special Tax Treatment for a Major Infrastructure Project - State Aid Uncovered photos 16

Special Tax Treatment for a Major Infrastructure Project

Introduction In April 2013, the Commission received a complaint alleging that State aid had been granted to the Oresund fixed link. The link is a major transport infrastructure project consisting of a bridge, an artificial island and tunnels between Denmark and Sweden. In October 2014, the Commission concluded that the public funding of the hinterland road and rail connections was […]
07. Mai 2024
State Aid Uncovered von Phedon Nicolaides
Public Procurement and State Aid - State Aid Uncovered photos 2

Public Procurement and State Aid

Introduction A faulty public procurement procedure or the use of discriminatory selection criteria can confer an advantage on the chosen undertaking that may constitute an advantage in the meaning of Article 107(1) TFEU. The result will be infringement of both public procurement rules and State aid rules. A recent Commission decision, SA.47650, is instructive on how Member States should design […]
08. Feb 2023
State Aid Uncovered von Phedon Nicolaides
State Aid May Have an Incentive Effect Even After the Start of Work: But Would it Favour Inefficient Operators? - Untitled design 11

State Aid May Have an Incentive Effect Even After the Start of Work: But Would it Favour Inefficient Operators?

Introduction Perhaps the most important aspect of the compatibility of State aid with the internal market is the presence of incentive effect. That is, the aid is capable of changing the behaviour of the recipient. If it does not, then public money is wasted because it has no effect on what happens on the market anyway. In principle, in order […]
24. Jan 2023
State Aid Uncovered von Phedon Nicolaides
State Resources Include all the Resources that Can be Directed by the State for its own Purposes - State Aid Uncovered SM posts 40

State Resources Include all the Resources that Can be Directed by the State for its own Purposes

Introduction On 12 January 2023, the Court of Justice delivered its judgment in joined cases C-702/20, DOBELES HES and C-17/21, Sabiedrisko pakalpojumu regulēšanas komisija.[1] A Latvian court requested the Court of Justice to provide a preliminary ruling on the interpretation of Article 107(1) TFEU, Article 108(3) TFEU, Regulation 1407/2013 on de minimis aid and of the procedural Regulation 2015/1589. The […]
03. Mai 2022
State Aid Uncovered von Phedon Nicolaides
The Standard of Proof in State Aid Complaints and the “Informational Disadvantage” of Complainants - State Aid Uncovered SM posts 4

The Standard of Proof in State Aid Complaints and the “Informational Disadvantage” of Complainants

The Commission must use its investigative powers to seek clarification from Member States in order for it to establish whether a measure constitutes State aid, or is compatible aid, or is existing aid. Introduction Complaints are an important source of information to the Commission. The possibility afforded to undertakings to lodge such complaints with the Commission is intended to dissuade […]
30. Nov 2021
State Aid Uncovered von Phedon Nicolaides
When Does an Amendment of an Existing Aid Make it a New Aid? - Blog KV 49

When Does an Amendment of an Existing Aid Make it a New Aid?

Existing aid becomes new aid if any amendment affects the assessment of its compatibility with the internal market. Introduction Member States often amend and adjust State aid measures after they are approved by the Commission. Such changes must be carried carefully because they can turn an existing aid into new aid and all new aid has to be notified to […]
06. Okt 2020
State Aid Uncovered von Phedon Nicolaides
Member States Beware: Compliance with the GBER and the SME Criteria has just Become more Difficult - doors 1767564 1920

Member States Beware: Compliance with the GBER and the SME Criteria has just Become more Difficult

I am grateful to Péter Staviczky for comments on an earlier draft of this article. I am solely responsible for its contents. The European Commission retains its sole right to assess the compatibility of aid granted on the basis of the GBER. Criteria defined in national law need not be taken into account by the Commission. The SME status has […]
25. Aug 2020
State Aid Uncovered von Phedon Nicolaides
The Non-economic Nature of Certain IT Services for Higher Education - ipad 820272 1920 1

The Non-economic Nature of Certain IT Services for Higher Education

Publicly funded educational services are not economic in nature. Activities intrinsically linked to public tasks are not economic in nature. Update on Temporary Framework: Number of approved and published covid-19 measures, as of 21 August 2020: 262* Legal basis: Article 107(2)(b): 28; Article 107(3)(b): 220; Article 107(3)(c): 20 Four Member States have implemented 16 or more covid-19 measures each: Belgium, […]
20. Dez 2016
State Aid Uncovered von Phedon Nicolaides
Existing v New Aid and Role of National Courts - m 7 1

Existing v New Aid and Role of National Courts

Modification of an existing aid measure turns it into a new aid measure if it affects its compatibility with the internal market. National courts must also notify to the Commission any new aid measure they detect.   Introduction On 26 October 2016, the Court of Justice ruled in case C‑590/14 P, DEI v Commission.[1] DEI, the incumbent electricity producer in Greece appealed against […]
08. Nov 2016
State Aid Uncovered von Phedon Nicolaides
1) Selectivity of Health Tests 2) Existing v New Aid in Preferential Electricity Tariffs - m 14

1) Selectivity of Health Tests 2) Existing v New Aid in Preferential Electricity Tariffs

A measure can be selective even if it applies to a whole sector. An existing aid measure becomes new when a court extends it temporarily.   Introduction This article reviews two judgments: one on BSE tests in Belgium and another on preferential electricity tariffs in Greece. The issue at hand with respect to the BSE test was whether a measure […]